Methodology and data sources
Every calculation, in the open.
This page is generated from the same code that runs the platform, so it cannot drift from what you see. Values marked Provisional are still being reviewed and are shown as such throughout the product.
What it is: a screening tool that estimates likely savings, costs and carbon, so you can decide where to look harder.
How sure we are: every figure carries a confidence level, and benefits are shown as ranges, never single numbers.
What it does not do: it is not a design, a survey, a quotation or a guarantee.
Principles
- Every number shows its source, date and confidence.
- Every score and recommendation is explainable, deterministic and auditable. The components and weights are always visible. There are no black-box AI decisions.
- Uncertainty is shown, never hidden. Benefits are ranges.
- One calculation engine is used by the browser, server, reports and alerts. There is no second copy that could disagree.
Confidence and freshness
Each record has a data confidence level based on where it came from, a last-updated date, and a freshness rating against how often that source normally updates.
Site confidence is a 0 to 100 score from five visible components:
Site confidence weights
Scores and weights
Opportunity is technical potential. Readiness is deliverability. Priority blends them and then discounts for thin data. Defaults are below, and every weight can be changed at account level in Settings.
Opportunity
Readiness
Priority
Priority = (Opportunity × 50% + Readiness × 50%) × confidence multiplier. The multiplier runs from 0.85 at zero confidence up to 1.00 at full confidence.
Why a multiplier and not a third added term? Adding confidence as a score would reward sites we know little about only when they happen to look good, and could lift a poorly evidenced site above a well evidenced one. A multiplier can only hold a site back, never push it up. The range shown beside each Priority score widens as confidence falls.
Measures and ordering
Measures are applied in a fixed order, each acting on the energy that remains after the one before, so benefits are never double counted:
- Baseload reduction
- Fabric and controls
- Heat pump
- Solar PV
- Tariff optimisation
Solar is therefore sized on demand after baseload savings and after a heat pump has added electrical load. All benefits are shown as low, central and high ranges, including across lifetime energy price scenarios.
Heat pump results are shown honestly: where running costs rise at current prices, we say so and flag it. Flags also cover radiators, building age and supply capacity.
Default assumptions
These are the defaults used until you override them. An override always wins; if the underlying default later changes significantly you are alerted to review it.
| Assumption | Value | Source | Updated | Confidence |
|---|---|---|---|---|
| Electricity unit price (non-domestic) | 22 / 27 / 33 p/kWh | Provisional | 1 Nov 2026 | Low |
| Gas unit price (non-domestic) | 5.5 / 7 / 9 p/kWh | Provisional | 1 Nov 2026 | Low |
| Export rate | 4 / 8 / 15 p/kWh | Provisional | 1 Nov 2026 | Low |
| Solar specific yield (Pennine, south-facing) | 780 / 860 / 930 kWh/kWp/yr | Being reviewed | 1 Nov 2026 | Low |
| Commercial solar installed cost | 850 / 1100 / 1400 £/kWp | Provisional | 1 Nov 2026 | Low |
| Roof area per kWp | 5.8 m²/kWp | Typical modern module layout, pitched roof | 1 Nov 2026 | Medium |
| Solar running cost | 1 % of capex / yr | Provisional | 1 Nov 2026 | Low |
| Heat pump seasonal COP | 2.4 / 3 / 3.6 SCOP | Typical range for retrofit air-source units | 1 Nov 2026 | Medium |
| Heat pump installed cost | 700 / 950 / 1300 £/kW thermal | Provisional | 1 Nov 2026 | Low |
| Existing boiler seasonal efficiency | 0.82 fraction | Typical for non-condensing and older condensing plant | 1 Nov 2026 | Medium |
| Discount rate (real) | 0.035 fraction | HM Treasury Green Book social rate (3.5%) | 1 Nov 2026 | Medium |
| Analysis period | 25 years | Typical solar asset life | 1 Nov 2026 | Medium |
| Solar output degradation | 0.5 % / yr | Typical module warranty assumption | 1 Nov 2026 | Medium |
The Energy Cost Outlook is three scenarios (low, central, high) for electricity and gas over 1 to 10 years, from public sources only. They are scenarios, not predictions. Current growth rates are provisional and reviewed each quarter.
Verification
For operational projects with half-hourly data we compare predicted and measured savings using a recognised approach (IPMVP, Option C: whole building). A baseline is fitted to the period before installation and adjusted for weather (heating degree days) and occupancy (occupied days). The method, baseline period and adjustments are shown on every result.
Fit quality is reported as R², CV(RMSE) and NMBE, and savings carry an uncertainty range at about 80% confidence, following the ASHRAE Guideline 14 approach. Benefit status moves from Estimated to Verified only after this process. Enerlens is built to verify outcomes; verified case studies follow once projects have run for 12 months.
Carbon
Carbon uses government greenhouse gas conversion factors, aligned with the GHG Protocol (Scope 1 for gas, Scope 2 location-based for electricity) and suitable for public sector and SECR-style reporting. Factors update annually.
Electricity
0.207 kg CO₂e / kWh
Government GHG conversion factors, UK electricity (generation), 2024
Being reviewedGas
0.183 kg CO₂e / kWh
Government GHG conversion factors, natural gas (gross CV), 2024
Being reviewedData sources and licences
Boundaries (ONS), roofs and footprints (Environment Agency LIDAR and open footprints), solar potential (our own model with PVGIS), actual energy use (Display Energy Certificates), modelled energy (non-domestic EPCs), grid capacity (DNO heatmaps), planning constraints, and energy prices and carbon factors (government and regulator publications). Open data is used under its published licence and attributed here.
Company ownership and title boundaries use Land Registry data; the licence for use inside a paid product is under review. Google Solar data is shown live and on demand in paid tiers only, on a Google map, and is not stored. Funding information is curated by Seam and shows a last verified date. See the Data page for live freshness by layer.
What this is not
- Screening only. It is not a design, a quotation or a guarantee of performance.
- Funding eligibility is indicative. The funding fit assessment is Enerlens’s own, not the funder’s.
- Energy prices are scenarios, not predictions. Nothing here is financial advice.
- Enerlens does not provide consultancy, install technology, broker projects or recommend suppliers.